Aban Energy

Innovation based on quality

AHU System Project – Adineh Clinic, Urmia

-

AHU System Project – Adineh Clinic, Urmia

Initial Need:At the Adineh 24-hour Clinic, considering the previously installed ductwork structure, there was a need to provide an air

Mikaland Mushroom Farm Ventilation Hall Project

-

Mikaland Mushroom Farm Ventilation Hall Project

Initial Need:Mikaland Mushroom Factory, in 2017 (1396 in the Persian calendar), was seeking a specialized solution for ventilating mushroom cultivation

500 Racks Data Center Project – Pardazesh Asr Ofoq Company

-

500 Racks Data Center Project – Pardazesh Asr Ofoq Company

Initial Need:In 2024 (1403), Pardazesh Asr Ofoq Company sought an advanced and efficient cooling solution for their new 500-rack data

Portable Rooftops Project – Arvand Petrochemical

-

Portable Rooftops Project – Arvand Petrochemical

Initial Need:In 2025 (1404), Arvand Petrochemical sought a flexible solution to provide ventilation across its various sites, which led to

Data Center Cooling Project – Yazd Province, Mehr Bank

-

Data Center Cooling Project – Yazd Province, Mehr Bank

Initial Need:The Branch Management of Yazd Province for Mehr Bank held a tender at the end of 2024 (late 1403)

Copied to clipboard